Village News

Christmas Lights

Approved with conditions | PA19/03725 | Outline application all matters reserved: Proposed new dwelling - Angarrack Farm House

Proposed construction of 2 storey dwelling - Angarrack Farm House 12 Grist Lane Angarrack Hayle TR27 5HZ

Ref. No: PA20/04787 | Received date: Thu 11 Jun 2020 | Status: Approved with conditions | Case Type: Planning Application

 

 


https://planning.cornwall.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=QBT2L0FG0JQ00

 

 

 


Date Published Document Type Measure Drawing Number Description View
  09 Jan 2021 CIL Notice Measure document icon  CIL LIABILITY NOTICE View document icon
  08 Jan 2021 Plan - Proposed Mixed Measure document icon  REVISED WITH OFF-SITE FFL View document icon
  08 Jan 2021 Decision Notice Measure document icon  ACFULZ - CONDITIONAL APPROVAL View document icon
  08 Jan 2021 Officer Report Measure document icon  DREPORT DELEGATED OFFICER REPORT View document icon
  22 Oct 2020 Plan - Other Measure document icon  FLOODPLAIN EXTENT View document icon
  02 Jul 2020 Plan - Existing Block Measure document icon  SURVEY DRAWING View document icon
  11 Jun 2020 Application Form Measure document icon  APPLICATION FORM View document icon
  11 Jun 2020 Statement - Design and Access Measure document icon  DESIGN AND ACCESS STATEMENT View document icon
  11 Jun 2020 Assessment - Flood Risk Measure document icon  FRA FLOOD RISK ASSESSMENT View document icon

 

Total CIL Liability £20,733.96

The current application has addressed issues previously raised, by moving the proposed site to the current, higher location and proposing an FFL of 12.97mAOD. This is above the level of 12.82mAOD recommended in the FRA, which was based on HEC-RAS modelling of 1 in 100 year fluvial flooding 40% climate change for undefended conditions, although embankments with gabions are currently in place along this side of the channel.

 


 

CONDITIONS:

  1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission.
    Reason: In accordance with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
  2. The development hereby permitted shall be carried out in accordance with the plans listed below under the heading "Plans Referred to in Consideration of this Application".
    Reason: For the avoidance of doubt and in the interests of proper planning.
  3. Other than any necessary groundworks the development hereby permitted shall not commence until the installation of a system for the disposal of surface water on the site has been implemented in accordance with the details which shall first have been submitted to and approved in writing by the Local Planning Authority. The details shall include a programme for maintaining the system. The system shall be retained and maintained thereafter in accordance with the approved details.
    Reason
    : To avoid flooding and in the interests of water quality and the residential amenities of future occupiers, in accordance with the aims and intentions of policy 26 of the Cornwall Local Plan (2010-2030) and with paragraph 163 of the NPPF (2019).

    Informative:

    The site lies within the Hayle Critical Drainage Area (CDA) as designated by the Environment Agency). All off-site surface water discharges from developments within the CDA should mimic greenfield performance up to a maximum 1 in 10-year discharge rate. On site all surface water should be safely managed up to the 1 in 100 plus climate change conditions. This will require additional water storage areas to be created thereby contributing to a reduction in flooding downstream.

    The preference for non-mains drainage is that surface water be discharged to ground via on-site soakaways. However, if the results of percolation tests, carried out in accordance with BRE365, show that infiltration rates are unsuitable for the use of soakaways then attenuation may be considered.

    The details required to discharge the condition shall include: -

    1. A description of the surface water drainage systems operation;
    2. Details of the final drainage schemes including calculations and layout;
    3. A Construction Surface Water Management Plan;
    4. A Construction Quality Control Plan;
    5. A plan indicating the provisions for exceedance pathways, overland flowroutes and proposed detention features;
    6. A timetable of construction;
    7. Confirmation of who will maintain the drainage systems and a plan for the future maintenance and management, including responsibilities for the drainage systems and overland flow routes.


  4. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any order revoking, re-enacting or modifying that Order), no development within Classes A, B, C, D and E of Part 1 of Schedule 2 to the said Order shall be carried out without an express grant of planning permission, namely:The enlargement, improvement or other alteration of the dwellinghouse;The enlargement of the dwellinghouse consisting of an addition or alteration to its roof;
    Any other alterations to the roof of the dwellinghouse;The erection of construction of a porch outside any external door of the dwelling;The provision within the curtilage of the dwellinghouse of any building or enclosure, swimming or other pool required for a purpose incidental to the enjoyment of the dwellinghouse as such, or the maintenance, improvement or other alteration of such a building or enclosure.
    Reason: In the interests of the amenities of the occupiers of adjoining dwellings/visual amenities of the area and to minimise flood-risk in accordance with policies 12 and 26 of the Cornwall Local Plan (2010-2030), policy SD2 of the Hayle Neighbourhood Plan (2014-2030) and with paragraphs 127 and 163 of the NPPF (2019).

 

PLANS REFERRED TO IN CONSIDERATION OF THIS APPLICATION:

Proposed 719/1 received 08/01/21

 

 

 

Book page

TitleCreated
240325 | Open letter to all party candidates | sign to help Cornwall Wildlife Trust make difference for Nature at election 23 hours 34 min agoBook page
240310 | Detailed plans for affordable-led housing in Connor Downs 10th March 2 weeks 3 days agoBook page
240310 | Waste collections changes Helston, Penzance, Hayle | second phase:food waste, recycling, rubbish - commences July 2 weeks 3 days agoBook page
240218 | Collapsed North Quay development in Hayle described as a 'sea of despair' 5 weeks 18 hours agoBook page
240214 | Hayle North Quay development collapse sees eight companies go bust Work has ground to a halt on the blocks of flats 5 weeks 3 days agoBook page
240220 | Poling works | Grist Lane and Marsh Lane, Angarrack | expected 20 Feb 2024 0830-1630, for one day 7 weeks 2 days agoBook page
231130 | Are you ready for weekly food waste recycling? | Food Waste, Recycling and Rubbish Collection Changes 16 weeks 4 hours agoBook page
230821 | People of Cornwall town 'thrown under bus' over housing plan | direct result of councillors handled Hayle masterplan 31 weeks 1 day agoBook page
230817 | When will new rubbish collection changes start, Cornwall 31 weeks 6 days agoBook page
230809 | Holiday park in Cornwall for emergency housing still empty | Sandbank site purchased Cornwall Council in Jan 2022 32 weeks 5 days agoBook page
230811 | Decision on huge solar farm at Carnhell Green: refused 32 weeks 5 days agoBook page
230809 | Nearest NHS dental practice to Cornwall taking new patients 32 weeks 5 days agoBook page