Installing Onsite - Twelve Drummers

It had just been completed in time, as early the next morning “the team” arrived to take the control unit and mount it on the scaffolding along with all the lighting frames being fixed in readiness for connecting up.

It took another couple of days in bitterly cold, icy weather (literally), to connect the wiring of all of the 13 frames’ cables back to the control unit and run in the power supply cable from the Electricity Supply feeder pole 35 metres away, these amounted to 38 cables, 90 cores in all (picture 12).

Being the first time, it took a long time to connect up, as each cable core had to be identified, marker numbers added to correspond with the terminal number it was to be connected to, and finally stripped back for a “crimp connector” to be attached before connecting up to the control unit's corresponding outgoing marshalling terminal.

In future years, providing there’s been no damage, it’s just a straightforward process of connecting up.

Final testing to confirm everything was lighting up as it should was completed the next morning (the morning of switch-on day) and luckily all went well, it was ready to roll! So it was finished just in time, it had turned out to be a very close call indeed, here's hoping it was enjoyed by "one and all".

Many thanks go to the very helpful "Elves" and also to the local "hot" refreshments providers', all much appreciated, especially in that weather!

From The ACL Techie Dept (also known as The Mickey Mouse Brigade!) - Christmas 2010

Copyright © GG Dec.2010

Picture 12 – Lighting frames and control unit mounted on scaffolding

Picture 12 – Lighting frames and control unit mounted on scaffolding

Contributions by GordonG

TitleUpdatedType
Installing Onsite - Twelve Drummers 15 years 4 weeks agoBook page
Final Fitting - Twelve Drummers 15 years 4 weeks agoBook page
Wiring the Components - Twelve Drummers 15 years 4 weeks agoBook page
Backplate Assembly - Twelve Drummers 15 years 4 weeks agoBook page
Sourcing the Equipment - Twelve Drummers 15 years 4 weeks agoBook page
Unit Design - Twelve Drummers 15 years 4 weeks agoBook page
Design & Equipment - Twelve Drummers 15 years 4 weeks agoBook page
First Impressions - Twelve Drummers 15 years 4 weeks agoBook page
The Call to Arms! - Twelve Drummers 15 years 4 weeks agoBook page
Program Chart - Twelve Drummers 15 years 4 weeks agoBook page
Bringing the Display to Life - Twelve Drummers 15 years 4 weeks agoBook page
Programming the PLC - Twelve Drummers 15 years 4 weeks agoBook page

Book page

TitleCreated
2026-EXTENDED-17th April 2026 to 22nd April- Resurfacing Steamers Hill; Hatchs Hill; Angarrack Lane | 1 Apr 07:30 - 17 Apr 23:59 1 day 14 hours agoBook page
2026-April-POSTPONED-planned improvements i.e. install footpath, paint double yellow lines junction Grist Lane Hatchs Hill 5 days 3 hours agoBook page
2026 - Resurfacing Steamers Hill; Hatchs Hill; Angarrack Lane | 1 Apr 07:30 - 17 Apr 23:59 2 weeks 2 days agoBook page
250330; Closure order:30 Mar-17 Apr 2026; 07:30-17:00; Clearway Parking Zone; Hatchs Hill, Steamers Hill and Angarrack Lane 3 weeks 4 days agoBook page
Traffic/Roads - Marsh/Grist Lane - Traffic counts 2019 onwards 15 weeks 1 day agoBook page
Approved with conditions | PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom... 19 weeks 4 days agoBook page
PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom, covered parking area below | As 20 weeks 3 days agoBook page
251027 | 20mph Monitoring—Hayle & St Ives Speed Data; Phase 3a-May-Jun 24 v Sep-Oct 24; Steamers Hill; Gwinear;Carbis;Nancledra 24 weeks 3 days agoBook page
PA25/07184 | Retention of 4no. existing holiday pods, swimming pool, incidental building, extended driveway and annexe converted 24 weeks 6 days agoBook page
251009 | Stark reality of life in Cornwall revealed through 2025 Vital Signs Report 27 weeks 13 hours agoBook page
251010 | Cornwall backs 20mph rollout; St Austell's the only town to reject the plans 27 weeks 22 hours agoBook page
250930 | Cornwall’s 20 mph speed limits have made the roads much safer 28 weeks 3 days agoBook page