The Cornwall Council (Hayle North Quay) Bridge Scheme 2010 Confirmation Instrument 2010
THE SCHEDULETHE CORNWALL COUNCIL (HAYLE NORTH QUAY) BRIDGE SCHEME 2010The Cornwall Council (hereinafter referred to as “the Council”) make this scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.
1. The Council are authorised to construct over the navigable waters of Hayle Harbour the bridge specified in the schedule to this Scheme as part of the highway they are proposing to construct between Merchant Curnows Quay, Copperhouse, Hayle and the Renewable Energy Business Park, Hayle Habour, Cornwall.
2. This Scheme may be cited as The Cornwall Council (Hayle North Quay) Bridge Scheme 2010.
Given under the common seal of the Council on the 10 day of August 2010.
Executed as a deed by THE
CORNWALL COUNCIL
Whose Common Seal was
Hereunto affixed in the
Presence of:-
J Broadway
Authorised Officer
THE SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE HAYLE NORTH QUAY BRIDGEThe location and general design of the Bridge are shown on the attached plan and marked “The Cornwall Council (Hayle North Quay) Bridge Scheme 2010” sealed with the Common Seal of the Council and deposited at the offices of Cornwall Council, County Hall, Treyew Road, Truro, Cornwall, TR1 3AY and at the Department for Transport, Local Authority Orders, Wellbar House, Gallowgate, Newcastle Upon Tyne, NE1 4TD.
POINTS OF COMMENCEMENT AND TERMINATIONFrom a point on Merchant Quay, Copperhouse Hayle, 78m west of the junction of St Elwyns Rise with Hayle Terrace (B3301) to a point on North Quay 105m south-east of the junction of King George V Memorial Walk with North Quay Road.
SPANSThe bridge will consist of 3 spans, a northern span of 18.7m, a central span of 20.5m and a southern span of 14.7m giving an overall length of 53.9m.
HEADWAYNot less than 0.8m above a mean high water springs level of 3.2m above Ordnance datum.
WATERWAYA minimum clear navigable waterway beneath the centre span of 14.3m.
OVERALL DIMENSIONSThe bridge will accommodate a single two lane carriageway, a footway and a maintenance strip. The bridge will be 10.5m wide at its widest point and will carry a 6.0m wide carriageway, with a 2.5m wide footway to the east of the carriageway and 0.5m maintenance strip on the west of the carriageway.
Contributions
- Angarrack Defibrillator Team (25)
- Angarrack Inn (336)
- Angarrack Methodist Chapel (3)
- Carol (15)
- Gail (1)
- GordonG (12)
- Hayle Development Group on Facebook (5)
- Hayle Harbour Authority (4)
- Hayle Town Council (5)
- louise (1)
- Lynne (100)
- Mal (1)
- MattBuckley66 (9)
- Neil (22)
- Neils Garden Care (9)
- Russell (21)
- Secretary - Christmas Lights (125)
- Steve (3)
- webmaster (5081)
Book page
tags in
Similar
- 160901 | Sluicing again today at 10am. Around 11am tomorrow and potentially over the weekend. We can only sluice during spring t
- 160804 | North Quay, Hayle Harbour | Corinthian Land Ltd
- 160818 | Private parking signs fitted to speed limit signs. North Quay Hayle
- 160628 | Video | North Quay, Hayle, Cornwall from Kitchener Land and Planning
- 160601 | Hayle - Riviere Fields | MAJOR DEVELOPMENT OPPORTUNITY HAYLE HARBOUR, ST IVES BAY
Similar across site
- 160901 | Sluicing again today at 10am. Around 11am tomorrow and potentially over the weekend. We can only sluice during spring t
- 160804 | North Quay, Hayle Harbour | Corinthian Land Ltd
- 160818 | Private parking signs fitted to speed limit signs. North Quay Hayle
- 160601 | Hayle - Riviere Fields | MAJOR DEVELOPMENT OPPORTUNITY HAYLE HARBOUR, ST IVES BAY
- 160628 | Video | Riviere Fields, Hayle, Cornwall from Kitchener Land and Planning
Hayle and Angarrack news | Google
- Cornwall beach party halted in police operation - BBC
- Cornwall beach party halted in police operation - BBC
- Live: Huge power cut in Hayle hits almost 3,000 properties - Cornwall Live
- Live: Huge power cut in Hayle hits almost 3,000 properties - Cornwall Live
- Live: Huge power cut in Hayle hits almost 3,000 properties - Cornwall Live
- Live: Huge power cut in Hayle hits almost 3,000 properties - Cornwall Live
- Live: Huge power cut in Hayle hits almost 3,000 properties - Cornwall Live
- Hayle beach party shut down before 200 revellers stormed seafront - Cornwall Live
- Hayle beach party shut down before 200 revellers stormed seafront - Cornwall Live
- Hayle beach party shut down before 200 revellers stormed seafront - Cornwall Live
- Hayle beach party shut down before 200 revellers stormed seafront - Cornwall Live
- Hayle beach party shut down before 200 revellers stormed seafront - Cornwall Live
Problems within 7km of Hayle | FixMyStreet
Hayle News
- ERROR: Database error: Table './rss/feeds' is marked as crashed and should be repaired at /var/www/html/feed.pl line 1657.
- ???? Hayle Day Care Centre, Commercial Road, Hayle TR27 4DE
- A post from Hayle Town Council
- A post from Hayle Town Council
- ???? We’re excited to announce that the design and delivery of the Hayle Terrace Community Garden project has been awarded to Sharp...
- * National Highways: A30 Hayle weather stations upgrade *
- Road Traffic Regulation Act 1984 S.14: Temporary Prohibition of Traffic
- Cornwall beach party halted in police operation - BBC
Facebook - Hayle Town Council
- ???? Hayle Day Care Centre, Commercial Road, Hayle TR27 4DE
- A post from Hayle Town Council
- A post from Hayle Town Council
- ???? We’re excited to announce that the design and delivery of the Hayle Terrace Community Garden project has been awarded to Sharp...
- * National Highways: A30 Hayle weather stations upgrade *
Recent comments
2 weeks 1 day ago
2 weeks 1 day ago
2 weeks 1 day ago
2 weeks 1 day ago
24 weeks 12 hours ago
38 weeks 2 days ago
1 year 3 weeks ago
1 year 39 weeks ago
1 year 40 weeks ago
1 year 40 weeks ago